First-time fix rate calculator

Work out how many repairs held on the first attempt, with no second visit or reopened work order.

Free, no sign-up. Nothing you type leaves your browser.

Calculate first-time fix rate

Showing the example from further down this page. Type your own numbers over it.

Not reopened, no repeat in your window.

Usually reactive work orders.

First-time fix rate86.7%

52 repairs fixed first time ÷ 60 repairs closed = 86.7%

8 of 60 repairs needed another go.

First-time fix rate formula

First-time fix rate = repairs fixed on the first attempt ÷ all repairs closed × 100

All repairs closed
usually the reactive work orders closed in the period
Fixed on the first attempt
not reopened, and not followed by the same fault on the same asset within a set window

How to calculate first-time fix rate

  1. Count the repairs closed. Usually the reactive work orders closed in the month.
  2. Take off the misses. Those reopened, or followed by the same fault on the same asset inside your window.
  3. Enter both. Then list the misses: they matter more than the rate.

First-time fix rate example: 60 repairs in one month, counted two ways

A made-up crew of four closes 60 repairs. Five are reopened, three are repeats within 14 days, and four needed a second visit for a part not in stock.

60Repairs closed
86.7%Reopened and repeats as misses
(60 − 8) ÷ 60
80%Part waits as misses too
(60 − 12) ÷ 60

What your first-time fix rate tells you

  • Sort the misses by cause. Parts, one machine that keeps coming back, or a fault misread from a one-word request. Each has its own fix.
  • Take the repeat machine further. That is what the root cause worksheet is for.

Never use it to grade people

If a reopened job counts against a technician, jobs stop being reopened. The number improves and the machines do not.

First-time fix rate questions

How long after a repair does a repeat count as a miss?

Set a window once, such as 14 or 30 days, and keep it. A new work order for the same fault on the same asset inside the window is a miss. A longer window finds more repeats, so the rate will read lower; it can only be compared with itself.

Is a second visit for an ordered part a miss?

Some crews count it, because a better-stocked shelf would have avoided it; others leave it out. Either works if it is written down and kept the same every month.

We only have about 20 repairs a month. Is the rate any use?

As a list, yes. With 20 repairs, one miss moves the rate by 5 points, so read the misses themselves rather than the percentage.

More free tools

All tools
  • MTTR calculator

    Mean time to repair

    Hours down ÷ failures

  • Root cause worksheet

    The 5 whys and a fishbone on one page

    One page to print, or save as a PDF

  • Wrench time calculator

    Paid hours spent hands-on

    Hands-on hours ÷ paid hours

Keep the misses on the record.

Start the trial: when a fault comes back, reopen the completed work order, and the reopen is written to its History. There is no first-time fix figure in the app, so the count is by hand.

30-day free trial. No credit card.