MTBF calculator

Work out mean time between failures from a machine's operating hours and how many times it failed.

Free, no sign-up. Nothing you type leaves your browser.

Calculate MTBF

Showing the example from further down this page. Type your own numbers over it.

Scheduled hours, less every hour down.

Times it could not do its job.

MTBF258 h

1,033 h ÷ 4 failures = 258 h

About 6.5 weeks at 40 running hours a week, or 3.2 at 80.

MTBF formula

MTBF = operating hours ÷ number of failures

Operating hours
scheduled hours less every hour down, planned or unplanned
Failures
times the machine could not do its job, counted by rules set once

How to calculate MTBF

  1. Pick one machine and one period. A quarter at least, or a year if it rarely fails.
  2. Enter its operating hours. Scheduled hours, less every hour it was down.
  3. Enter its failures. Count them by a rule you set once.

MTBF example: a labeler over one quarter

A made-up labeler runs two 8-hour shifts, five days a week: 80 hours a week, 1,040 over 13 weeks.

1,040 hScheduled
80 h × 13 weeks
1,033 hOperating
less 7 h down
4Failures
258 hMTBF
1,033 ÷ 4

That is one failure about every three weeks of two-shift running.

What your MTBF tells you

  • Rank your machines each quarter. The lowest is usually the place for the next root cause worksheet.
  • Read it beside MTTR. MTBF says how often; the MTTR calculator says how long each stop lasts.
  • Keep the rule fixed. Change what counts as a failure and the trend means nothing.

Not a life expectancy

If failures come at random, about 63% of the gaps are shorter than the MTBF. A 258-hour figure does not promise 258 quiet hours.

MTBF questions

What if the machine had no failures in the period?

Then it has no MTBF yet, and the calculator says so. Report it as no failures in that many hours: that is a lower limit, not a figure.

Why is my MTBF far below the maker's figure?

A maker's published MTBF rests on its own assumptions and test conditions, which are rarely those of your floor. Compare a machine with its own earlier periods, and with identical machines on your site.

Can I use one MTBF for the whole site?

It will not tell you much. Six machines with 8,448 hours and 12 failures give 704 hours, which describes none of them and hides the one that fails most. Work it out one machine at a time.

More free tools

All tools
  • MTTR calculator

    Mean time to repair

    Hours down ÷ failures

  • OEE calculator

    Overall equipment effectiveness

    Availability × performance × quality

  • Root cause worksheet

    The 5 whys and a fishbone on one page

    One page to print, or save as a PDF

See which machines keep failing.

Start the trial and mark an asset Down when it stops. On Pro and Max, Reporting shows Admins MTBF for the five assets with the most unplanned downtime in the date range.

30-day free trial. No credit card.