Incident rate calculator

Work out TRIR, DART and LTIFR from the hours your people worked and the cases on your log.

Free, no sign-up. Nothing you type leaves your browser.

Calculate TRIR, DART and LTIFR

Showing the example from further down this page. Type your own numbers over it.

From payroll, without paid time off.

Beyond first aid, from your injury log.

Days away, restricted work or transfer.

At least one day away from work.

TRIR53 × 200,000 ÷ 120,000 hDART rate3.332 × 200,000 ÷ 120,000 hLTIFR8.331 × 1,000,000 ÷ 120,000 h

A TRIR of 5 is 5 recordable cases for every 100 full-time workers in a year.

TRIR, DART and LTIFR formulas

TRIR = recordable cases × 200,000 ÷ hours worked

DART rate = DART cases × 200,000 ÷ hours worked

LTIFR = lost time injuries × 1,000,000 ÷ hours worked

200,000 hours is 100 people working full time for a year, so a TRIR of 5 reads as 5 cases for every 100 full-time workers, whatever the size of the site.

How to calculate TRIR, DART and LTIFR

  1. Pick the period. A calendar year is usual. Hours and cases must cover the same weeks.
  2. Enter the hours worked. From payroll or time records, without vacation, sick leave or holidays.
  3. Count the cases from your log. Leave a count blank if you do not keep it, and its rate is left out.

What counts as a case

A recordable case
A work-related injury or illness with death, days away, restricted work or transfer, treatment beyond first aid, or loss of consciousness. A significant diagnosed one counts too (OSHA, 29 CFR 1904.7).
A DART case
A recordable case with days away from work, restricted work or a job transfer. On OSHA's Form 300 log, those marked in columns H and I.
A lost time injury
Not defined by any US rule. The ILO counts an injury that keeps a person away for at least one day, not counting the day it happened. If a client asks for LTIFR, use their definition.

TRIR example: a packaging plant with 60 people

A made-up plant, with 120,000 hours worked in the calendar year and three injuries on the log.

5TRIR
3 × 200,000 ÷ 120,000
3.33DART rate
2 × 200,000 ÷ 120,000
8.33LTIFR
1 × 1,000,000 ÷ 120,000

At 120,000 hours, every recordable case adds 1.67 to this plant's TRIR. One more cut next year, and the rate goes from 5 to 6.67 with nothing else changed.

The three cases, and how each is countedA cut hand, a back strain and a sprained wrist.
  • A cut hand that needed stitches. Stitches are medical treatment beyond first aid, so the case is recordable, but the packer was back on the line the same shift.
  • A back strain that kept a forklift driver at home for four days. Recordable, a DART case for the days away, and a lost time injury.
  • A sprained wrist that put a machine operator on light duty for two weeks. Recordable, and a DART case for the restricted work, but not a lost time injury: no day was missed.

What your incident rate tells you

  • Read the trend and the cases. On a small site, three cases of the same kind, at the same machine, say more than a TRIR of 5. The rates are arithmetic on your own log: on their own they do not say whether a site meets any rule.
  • Compare with your industry. The US Bureau of Labor Statistics publishes rates by industry every year from its survey of occupational injuries and illnesses, worked out the same way.

Keep the log first

The rates are only as good as the log behind them. A case left off the log, or a light-duty case written up as first aid, makes the rate look better than the plant is.

How to count hours workedWhat the Bureau of Labor Statistics asks for.

The Bureau of Labor Statistics asks for the hours all employees actually worked, from payroll or other time records. Paid time that is not work stays out: vacation, sick leave and holidays. For people whose hours are not recorded, such as salaried staff, it allows an estimate from their scheduled hours, or 8 hours for each day worked.

Count the hours for the same period as the cases. A year of cases over six months of hours gives a rate twice as high as it should be.

Where the formulas come fromThe BLS, OSHA and the International Labour Organization.

Incident rate questions

Is this incident rate calculator free?

Yes. It needs no sign-up and nothing to install. It runs in your browser: what you type is sent nowhere and is gone when you close the page.

Why is TRIR worked out per 200,000 hours?

200,000 hours is what 100 people working full time put in over a year: 40 hours a week for 50 weeks. So a TRIR of 5 reads as 5 recordable cases for every 100 full-time workers, whatever the size of the site. The US Bureau of Labor Statistics uses this base for its own rates.

What is a good TRIR?

There is no single number. Compare your rate with your own past years, and with the rate the Bureau of Labor Statistics publishes for your industry from its yearly survey. On a small site one case moves the rate a long way, so read the cases behind the number too.

What is the difference between TRIR and LTIFR?

TRIR counts every recordable case per 200,000 hours worked. LTIFR counts only the injuries that cost at least a day away from work, per 1,000,000 hours. The same log gives two different numbers, so compare a TRIR only with another TRIR, and an LTIFR only with another LTIFR.

Can I work out a rate for one month or one quarter?

Yes, as long as the hours and the cases cover the same weeks. A short period has fewer hours, so a single case moves the rate further. A rolling 12 months is steadier.

More free tools

All tools
  • Downtime cost calculator

    What one stop really cost

    Each cost added up ÷ hours down

  • Root cause worksheet

    The 5 whys and a fishbone on one page

    One page to print, or save as a PDF

  • Inspection calendar

    Fire and safety checks by month

    Year plan to print, calendar file, CSV

Make each finding a check that repeats.

Start the trial, write the safety walk as a procedure and attach it to a work order that repeats every month. When one is completed, the next is created, due on the schedule's next date.

30-day free trial. No credit card.