EOQ calculator

Work out the economic order quantity: the order size that keeps ordering and holding costs lowest.

Free, no sign-up. Nothing you type leaves your browser.

Calculate economic order quantity

Showing the example from further down this page. Type your own numbers over it.

For a part used at a steady rate.

Time to raise and receive it, plus freight.

Often a percentage of what one costs: 25% of $8 is $2.

EOQ139

√(2 × 480 × 40 ÷ 2) = 138.56, round up to 139

At 139 at a time, about 3.5 orders a year.

EOQ formula

EOQ = √(2 × D × S ÷ H)

D
how many you use in a year
S
the cost of placing one order: raising, approving, receiving and paying for it, plus freight
H
the cost of holding one unit for a year, often a percentage of the unit cost

How to calculate EOQ

  1. Pick a steady consumable. Filters, belts, grease: something used at a known rate.
  2. Enter the use and the two costs. A rough figure is fine: the answer moves slowly.
  3. Round to the case. Then check the order fits on the shelf.

EOQ example: 480 air filters a year, ordered by the case

A made-up office building uses 480 filters a year, at $8 each.

480Filters a year (D)
$40Cost of an order (S)
time plus freight
$2Holding one a year (H)
25% of $8
139EOQ
√(2 × 480 × 40 ÷ 2)

They come in cases of 12, so the building orders 144, twelve cases, three or four times a year.

What your EOQ tells you

  • Pair it with a reorder point. EOQ says how many; the reorder point calculator says when. Together they make a min and a max.
  • Do the ones that matter. Work it out only for the 10 to 20 consumables you order most.

It assumes steady use

Filters on a fixed change schedule come close. A part that fails at random does not, so EOQ belongs to the steady part of your stores.

EOQ questions

My holding cost is a percentage. What do I enter?

The dollars it comes to for one unit over a year: the percentage times the unit's cost. At 25% of an $8 filter, that is $2.

Should I use EOQ for a critical spare?

No. A gearbox used twice in five years, at $4,800, gives an EOQ of 0.16 of a gearbox. The real question there is whether to keep one at all, and that rests on what the downtime would cost when the shelf is empty. The downtime cost calculator helps with that.

Do I have to order exactly this many?

No. The bottom of the cost curve is flat: in the example, anything from about 100 to 200 filters costs within $20 a year of the best. Round to the case size, and check the order fits on the shelf.