What is fault tree analysis?

Fault tree analysis (FTA) starts from one unwanted event, such as no heat in a building, and works down through AND and OR gates to every failure, or combination of failures, that could cause it.

By MaintensorUpdated

How a fault tree works: top event, gates and basic events

A fault tree has one top event, the thing you do not want, and under it the events that could cause it, down to basic events such as a part failing or a breaker tripping. Two gates join the levels:

  • An OR gate means any one event below it is enough: a single failure gets straight through.
  • An AND gate means all the events below it must happen together: this is where backups live, such as two boilers.

The US Nuclear Regulatory Commission’s 1981 Fault Tree Handbook (NUREG-0492) is a free, full reference, symbols included.

Fault tree example: no heat in a building with two boilers

A made-up building has two boilers, B-1 and B-2, either of which can heat it alone; a duty pump, P-1, with a standby, P-2, that should start when P-1 stops; and one gas service, one boiler room power panel and one controller with an outdoor sensor.

No heat in the buildingORNo hot water madeHot water not movingNo gas to the boiler roomNo power to the boiler room panelControls not calling for heatANDANDORB-1 not firingB-2 not firingORORBurner lockoutLow-water cutoff trippedFlame sensor failedBurner lockoutLow-water cutoff trippedFlame sensor failedP-1 failedP-2 failed, or did not start on changeoverOutdoor sensor failedController failedNo heat in the buildingORNo hot water madeANDB-1 not firingORBurner lockoutLow-water cutoff trippedFlame sensor failedB-2 not firingORBurner lockoutLow-water cutoff trippedFlame sensor failedHot water not movingANDP-1 failedP-2 failed, or did not start on changeoverNo gas to the boiler roomNo power to the boiler room panelControls not calling for heatOROutdoor sensor failedController failed
The no-heat tree, drawn. Gas, power and the controls sit right under the top event: any one of them stops the heat alone.

Gas and power sit at the top, not under each boiler, because one closed gas valve takes out both boilers at once, and one tripped breaker can take out the boilers and the pumps together. A cause shared by both sides of a backup is a common cause, and exposing it is the first thing a fault tree is good at.

Reading the tree, with numbers

Follow the OR gates from the top: gas, power, the controller and the outdoor sensor can each stop the heat alone. Those are the single points of failure. Each is a minimal cut set, the smallest group of failures that causes the top event on its own; a fault on B-1 together with a fault on B-2 is another.

Some made-up numbers for a 180-day heating season (4,320 hours): each boiler is out 2% of the time, independently of the other, and the single controller 0.5%.

1.7 hBoth boilers out
0.02 × 0.02 × 4,320 h
22 hThe controller out
0.005 × 4,320 h
12.5×Controller vs both boilers
21.6 h ÷ 1.73 h

So the backup boiler is doing its job, and the next dollar goes to the parts with no backup: a spare outdoor sensor, a yearly check of the gas valve train by a qualified technician, and a monthly test that P-2 really starts when P-1 is stopped.

Draw a tree like this for the three or four systems where a stop hurts most.

Fault tree vs 5 whys and FMEA

  • The 5 whys follows one chain from one problem, in under an hour: enough for most breakdowns.
  • A fault tree follows every branch, in a few hours for a small system: for systems with backups.
  • FMEA works up from each part of one machine, before anything has failed.

The root cause analysis guide sets these tools side by side.

A system’s assets and tests in Maintensor

Maintensor has no fault tree tool, but as equipment maintenance software it can keep a tree’s system together. An asset can sit inside another (its Parent asset), so a boiler plant, its boilers and its pumps are recorded as one system, and the standby pump’s changeover test can be a work order that repeats every month.

In Reporting (Pro and Max, for Admins), Most problematic assets shows which machines lost the most time to unplanned stops.

Questions

What people also ask.

More in the glossary, or see the whole product on the features page.

What is the difference between fault tree analysis and FMEA?

They run in opposite directions. Fault tree analysis starts from one event at the top and works down to the failures that could cause it. FMEA starts from each part of a machine and works up to what its failure would do. A fault tree is better for a system with backups; an FMEA is better for deciding the checks on one machine.

Can a fault tree be used after a failure has happened?

Yes. Put the failure that happened at the top, build the tree, then use evidence to cross off the branches that did not happen. It is slower than the 5 whys but better when several things had to go wrong together, such as a standby pump that failed to start when the duty pump tripped.

Start with the machine that gives you the most work.

Start the trial, add that one asset with its location and nameplate, and write its first work order. Its history builds from there, job by job.

30-day free trial. No credit card.