Useful life in three senses: service life, tax recovery and reliability
The term has three uses, and mixing them up causes most arguments.
Only the first answers a maintenance question: a machine fully depreciated is written off, not worn out. The tax figures are information, not tax advice.
Useful life example: rebuild or replace a 14-year-old compressor
A made-up air compressor, 14 years old, needs an airend rebuild quoted at $7,000. Its repair bills over the last three years ran $2,000, $3,500 and $5,000, and its unplanned downtime 4, 6 and 10 hours.
a year, rebuild included
a year, over 15 years
before downtime and energy
The numbers, line by lineHow each yearly cost is worked out.
| Option | How the cost is worked out | Per year |
|---|---|---|
| Keep it 3 more years | $7,000 rebuild now, plus an assumed $4,000 a year of other repairs (below last year’s $5,000, since the airend is new): $19,000 over 3 years | About $6,300 |
| Replace it | $24,000 installed, spread over an expected 15 years, plus $1,200 a year of routine service | About $2,800 |
The example leaves out interest and taxes; finance will add them. Every figure is invented.
If the money is not there this year, the rebuild buys time, and the replacement goes on next year’s budget with this table.
Signs in the history that the end is near
Repair cost rising two or three years running; failures coming closer together, a falling MTBF; the same part replaced again and again; parts discontinued or weeks away; a safety or efficiency standard it can no longer meet.
Useful life vs lifecycle management, MTBF and deferred maintenance
- Asset lifecycle management covers the whole life from purchase to disposal. Useful life is the length of the operating stage.
- MTBF is the average time between failures, not the length of a life. A machine can fail every three months for twenty years.
- Deferred maintenance shortens useful life: the ASHRAE service lives depend on proper maintenance, such as regular filter changes.
Write the install year into the asset register and every repair on a work order, so the evidence exists; the maintenance budget guide covers making the case for the money.
Repair-or-replace evidence in Maintensor, without a purchase date
Maintensor does not store a purchase date, purchase cost, expected life or depreciation; write the install year in the asset’s Description.
Each asset’s Work orders tab lists its finished jobs with their cost (parts only below Max; labor and other costs on Max), and the record warns when the same part has been used on it three or more times this year. On Pro and Max, Reporting (for Admins) lists the most problematic assets with their MTBF and repair cost.