What is risk-based maintenance?

Risk-based maintenance (RBM) spends maintenance effort in proportion to risk: how likely each failure is, times how bad it would be. The highest scores get the most frequent, thorough work; the lowest get light checks or run to failure.

By MaintensorUpdated

How risk-based maintenance scores likelihood times consequence

risk score = likelihood × consequence

Likelihood
how often the failure is expected, from 1 to 5, judged from the asset's history, the maker and the people who run it
Consequence
the worst the failure could do, from 1 to 5: hurt someone, release something, stop production, or cost money to repair

Scores run from 1 to 25: they rank equipment, they do not measure it. Write both scales down once, so two people scoring one machine agree.

The asset criticality entry has a starting pair of scales; NASA’s RCM guide for facilities (tables 4-1 and 4-2) has finer 10-point ones for severity and probability of occurrence.

Risk-based maintenance example: six assets at a food plant

A made-up food plant scores six assets with the people who look after them. The top one:

3Likelihood
Main air compressor, no backup
4Consequence
the plant stops
12Risk
3 × 4, first of the six
The six assets, and what each getsHighest risk first. Every score is made up.
Asset Likelihood Consequence Risk What it gets
Main air compressor, no backup 3 4 12 Monthly checks with readings, oil samples, critical spares on the shelf
Steam boiler 2 5 10 The inspections its jurisdiction requires, a contractor service, daily checks
Forklifts 3 3 9 The daily examination OSHA requires (29 CFR 1910.178(q)(7)), and a service at the maker’s interval
Case sealer, Line 1 4 2 8 A daily operator check and a monthly service
Dock leveler 2 2 4 A quarterly service
Break room refrigerator 2 1 2 Run to failure

The compressor gets monthly checks with readings and critical spares on the shelf; the break room refrigerator runs to failure. The score moves, too: if a year of good care takes the case sealer’s likelihood from 4 to 3, its risk drops from 8 to 6.

Rules come before scores

The boiler and the forklifts get their required inspections whatever they score. A score never removes a check that a law, a code, an insurer or the maker requires.

Risk-based maintenance vs criticality, RCM and risk-based inspection

  • Asset criticality ranks the assets, often with this same score; risk-based maintenance goes on to set each one’s tasks and intervals.
  • Reliability-centered maintenance picks a task for each failure mode. Rank by risk, then give the top few a reliability-centered review.
  • Risk-based inspection is the process-industry version for pressure vessels, piping and tanks: API Recommended Practice 580 (4th edition, 2023) and API RP 581 apply to that equipment; this page does not replace them.

Scoring 15 to 30 assets in an hour, and the multiplication trap

Score only the 15 to 30 assets that matter, in an hour with the technicians and a production lead. Where people disagree by two points or more, talk it through: someone knows something. Score again each year, with the year’s history in hand.

Treat any 5 on safety as high

A safety consequence of 5 with a likelihood of 1 scores only 5, yet deserves attention, whatever the product says.

The ranking is one input to your maintenance strategy, not the whole of it.

Evidence for the likelihood score in Maintensor

Maintensor has no risk or criticality field on an asset, so the scores live in a spreadsheet. What the app holds is the evidence for the likelihood column. Each asset’s Work orders tab lists its open and done work with what it cost, and on Pro and Max an admin’s Reporting shows unplanned downtime, MTBF and the most problematic assets for any date range.

Questions

What people also ask.

More in the glossary, or see the whole product on the features page.

What is the difference between risk-based maintenance and risk-based inspection?

Risk-based inspection (RBI) is a specific practice for pressure equipment and piping in refineries and chemical plants, set out in API Recommended Practice 580, that plans inspections from the likelihood and consequence of failure. Risk-based maintenance applies the same idea more broadly, to any equipment and any kind of maintenance task.

Is risk-based maintenance the same as asset criticality?

They overlap, and the two words are often used for the same thing. A criticality ranking sorts assets by how much their failure would matter, often multiplied by how likely it is. Risk-based maintenance uses that kind of score to set what maintenance each asset gets and how often.