Inspection calendar

Tick what your building has and get the usual fire and safety checks for ten common items by month, for the United States or Canada.

Free, no sign-up. Nothing you type leaves your browser.

These are the usual minimums. Your fire marshal, your insurer or your state or province may ask for more.

Where is the building?

The checks and how often each one is due follow that country's usual minimums. You can change any interval after.

What the building has

Tick each one, with how many where it counts. Under it come its checks: who usually does each one, how often, and the source. For anything less often than once a year, give the date it was last done.

Pick where the building is first: the checks and how often depend on it.

The year plan

How many times each one falls due in each month, and the total for the month at the foot.

Pick where the building is and tick what it has to see the plan.

Nothing is saved, so print or download before you close the page. Printing and the calendar file work best on a computer.

What goes on the plan

Each item carries the checks a building usually needs for it, in three kinds of line:

Your own people's checks
The monthly look at each fire extinguisher, the weekly run of an eyewash station, the generator's monthly run under load.
The contractor's service
One line each, such as the sprinkler company's quarterly visit. The dozens of parts they test are their work.
The long tests
Lines of their own: the 6-year extinguisher service, the 12-year shell test, the sprinklers' 5-year internal pipe check.

Each interval is the usual minimum in the country you pick, with its source linked on the check. Where a state, province, city or water supplier sets the interval, the check starts with none and one sentence on who sets it.

How the dates workBlank dates, long tests, overdue checks and counts.

The dates work as in the maintenance schedule maker. A check of a year or less starts on the date you give, or in the plan's first month when you leave it blank. A check that comes round less often than once a year takes the date it was last done and lands in the year it falls due; without that date it waits under the plan, not due in these 12 months (for one never done, give the date it was made or put in). A check whose due date has already passed goes in the plan's first month, marked overdue since that date. A count is part of the item's name on the plan, "Fire extinguishers (14)", never 14 rows. Where the kind changes the checks, a wet or dry sprinkler system or the kind of extinguisher, the item asks which kind and starts on the usual one.

Example: a two-story office

A made-up building in Ohio, with the United States picked and all ten items ticked: 14 fire extinguishers, a monitored fire alarm, a wet pipe sprinkler system, 36 emergency lights and exit signs, 6 fire doors, an eyewash station, a generator, a hot water boiler, one elevator and 2 backflow preventers.

18Checks on the plan
5Long tests
wait for a last-done date
3With no interval yet
each says who sets it
30In the first month
about, if every date is blank

The other months hold 19 to 25. Give each yearly check a date in a quiet month of its own and the load evens out.

The 18 checks, by how oftenAnd the long tests and the checks with no interval.
  • Every week: the eyewash run, a look over the generator and the boiler's controls, 4 or 5 times a month each.
  • Every month: the extinguishers, the sprinkler valves and gauges, the 30-second test of each light, the generator's run under load, the boiler's low-water cutoff and safety valve, and the elevator's firefighters' recall test.
  • Once a year, your own people: the 90-minute battery test of the lights and the eyewash station's inspection.
  • The contractors: the sprinkler company every 3 months, the fire alarm company and the boiler technician every 6 months, and once a year the extinguisher technician, the generator technician and the fire door inspection.

Five long tests wait under the plan for the date they were last done: the extinguishers' 6-year service and shell test, the sprinklers' gauges and internal pipe check, and the generator's long run every 3 years. The last service reports say when. Three checks sit under No interval yet, each with who sets it: the boiler inspection, the elevator inspection and the backflow tests.

The United States and Canada

The same building gets different checks in each country, because each adopts different codes.

Where the rules come fromNFPA and OSHA in the United States, the National Fire Code in Canada.

In the United States, each state and city adopts its own fire code, and most call on NFPA standards: NFPA 10 for extinguishers, NFPA 25 for sprinklers, NFPA 72 for fire alarms, NFPA 80 for fire doors, NFPA 101 for emergency lights and NFPA 110 for generators. In a workplace, OSHA's rule on portable extinguishers sets the monthly look, the yearly service and the shell tests. In Canada, each province and territory adopts the National Fire Code of Canada or publishes its own, and the code calls on standards such as CAN/ULC-S536 for fire alarms and CSA C282 for emergency generators.

What changes for the same office in CanadaThe fire alarm, the fire doors, the generator and the elevator.
  • The fire alarm gains a monthly test by your own people, one device in turn, the signals and the batteries, and its contractor's visit becomes yearly.
  • The fire doors are opened and closed each month to see that each one closes and latches. The National Fire Code sets no yearly fire door inspection; your province may.
  • The generator's monthly run becomes 60 minutes at 30% load or more, and its yearly service a full-load test with fresh fuel.
  • The elevator's recall test leaves the plan: the code asks for it every 3 months in high buildings only, and the province's own elevator rules come first.

The usual minimums, not more

Your fire marshal, your insurer or your state or province may ask for more than these, and the edition your city or province adopted may be older or newer than the one cited. The source is linked on each check: read it, or ask the authority having jurisdiction, before you rely on an interval.

What to look at on the day

The calendar says when each check falls due. The checklist says what to look at, with a form to print:

About the filesThe calendar file and the CSV.

The calendar file follows the iCalendar standard, RFC 5545: one repeating all-day event for each check, with who does it and its source in the event's notes. The CSV has one line for each date a check falls due in the 12 months: the date written out, such as Nov 3, 2026, the item, the check, who does it, how often and the source.

Questions

Is this inspection calendar free?

Yes. It needs no sign-up and nothing to install. It runs in your browser: what you tick and type is sent nowhere and is gone when you close the page, so print the plan or download the files first.

Are these intervals what the law asks of my building?

They are the usual minimums from the source named on each check, such as an NFPA standard, an OSHA rule or the National Fire Code of Canada. Your fire marshal, your insurer or your state or province may ask for more, and the edition your city or province adopted may differ from the one cited. Read the source, or ask the authority having jurisdiction, before you rely on an interval.

Why do elevators, backflow preventers and boiler inspections have no interval?

Because no national rule sets one. Each state or province sets how often elevators are inspected and boilers get an inspector's visit, and the water supplier or the plumbing code sets how often each backflow assembly is tested. The tool says who sets it and lists the check under No interval yet until you choose how often.

How do I get the inspections into my calendar?

Press Download calendar file, then import the file in your calendar app. In Google Calendar on a computer that is Settings, then Import and export. Each check becomes one repeating all-day event, with who does it and the source in its notes.

What about the daily checks?

The calendar places a check once a week at the most often. Where a source asks for a daily look, such as a fire alarm panel's trouble lights in Canada or a steam boiler's low-water cutoff, it is said in small words on that check's row.

Can I add equipment that is not on the list?

Not here: the list is the ten items with usual minimums behind them. The maintenance schedule maker takes any asset or job and how often, and makes the same year plan and files.

More free tools

All tools

Let each inspection come round by itself.

Start the trial and set each check up as preventive maintenance in the app: it repeats on the calendar, and completing one job creates the next.

30-day free trial. No credit card.