Emergency lighting inspection and test log

An emergency lighting inspection is a short test of each battery light and exit sign every month and a full-length test once a year, recorded in a log. Your own staff can do both, in the US and Canada.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorPublished

The blank emergency lighting test log, one landscape page: the building, the test and who made it, a line for each light and exit sign with boxes for its checks, initials and a note, then the five checks made once for the round, each with a box for OK and Fail.

What the log holds

One landscape page for a building or a floor, each test: what kind of test, who made it and when, a line for each light and exit sign, and five checks made once for the round. Keep the list of units, or a floor plan with them marked, with the log.

Pilot light onThe unit's small charging or status light is lit before the test starts.
Comes on when testedThe lamps light on the battery when the unit's power is cut or its test switch is held.
Lit for the whole testStill lit, not fading, at the end: 30 seconds a month, and once a year 90 minutes in the US or the design time in Canada.
Initials and a noteWho tested it, and what was done about a fail.

ExampleThe yearly test in a small warehouse

A made-up warehouse in Saskatchewan: four battery lights and two exit signs, tested for their design time of 30 minutes by Laura Bennett in October.

Unit Kind Comes on Whole test Note
EL-01, office corridor Light OK OK
EL-02, dock 1 Light OK OK
EL-03, dock 3 Light OK Fail Dim at 20 minutes. Battery from 2018 replaced, retested Oct 9
EL-04, battery charging Light OK OK
EX-01, main exit Sign OK OK
EX-02, dock exit Sign Fail Fail Did not light. Unit replaced by an electrician

EL-03. It passed every monthly test this year. Only the long test shows a battery running down early, and the Minnesota Department of Health’s guide puts a maintenance-free lead-acid battery’s life at 5 to 10 years.

EX-02. A sign that does not light on its battery leaves an exit dark in an outage. The electrician’s work goes on the log’s note, then the unit is tested again.

The checks for each round

Each round, the tester also checks the building as a whole: every unit found, the exit signs seen, the batteries looked at.

The monthly safety inspection checklist glances at these lights on its walk; this log is the test itself.

Once for the round5 checks

  • Every light and sign on the list found and tested
  • Exit signs visible, lit and not blocked
  • Battery units: terminals clean and tight, battery clean and dry
  • Self-testing units: no fault showing
  • After the yearly test: chargers to the maker's figures (Canada)
What counts as a fail, check by checkThe full tables, and where each check comes from.

NFPA 101 is the US Life Safety Code; NFC is the National Fire Code of Canada 2020. “Practice” means common practice and no rule.

Each light and exit sign

Check Fail if Source
Pilot light on Off, damaged or hidden NFC 6.5.1.6(1)(a); practice in the US
Comes on when tested No light on battery NFPA 101, 7.9.3.1.1; NFC 6.5.1.6(2)(a) and 6.5.1.8(2)(a)
Lit for the whole test Out or dim before the time is up NFPA 101, 7.9.3.1.1; NFC 6.5.1.6(2)(b) and 6.5.1.8(2)(b)

Once for the round

Check Fail if Source
Every light and sign on the list found and tested A unit missing, or skipped Practice; NFPA 101 asks for every required unit
Exit signs visible, lit and not blocked A sign hidden by stock or a new wall, or unlit NFC Note A-6.5.1.8; practice
Battery units: terminals clean and tight, battery clean and dry Corrosion, a loose clamp, a wet or dirty battery NFC 6.5.1.6(1)(b) to (d)
Self-testing units: no fault showing A status light showing a fault NFPA 101, 7.9.3.1.2
After the yearly test: chargers to the maker’s figures (Canada) Charging voltage, current or recovery time outside the maker’s figures NFC 6.5.1.6(3)

How often, in the United States and Canada

The usual minimums. Your fire marshal, insurer, state or province may ask for more.

Check By United States Canada
Battery lights and exit signs: switch to battery Your staff Monthly, 30 seconds, 3 to 5 weeks apart Monthly, with a look at the pilot light, terminals and battery
Battery lights and exit signs: the long test Your staff Yearly, 90 minutes Yearly, for the design time, then the charger checked
Self-testing units Your staff A monthly look at the status light; yearly, 90 minutes The same tests as other battery units
Lights fed by the building’s generator Your staff Monthly, 30 seconds on generator power Yearly: the lights and signs work on emergency power

The US figures are from NFPA 101 (2012), 7.9.3.1, as the Minnesota Department of Health’s guide gives them. The Canadian ones are from the National Fire Code of Canada 2020, 6.5.1.6 to 6.5.1.8. The generator itself has its own tests on the generator maintenance checklist.

How the test is made

The Minnesota guide lists three ways to put a unit on its battery, each with a catch. The unit’s maker says which suits its units.

The test switch or buttonEasy for 30 seconds. On older units the switch can fail to cut the power, so it tests the lamps and not the battery.
Unplugging a unit on a cordWhere the unit is plugged in on a short cord. Plug it back in right after, so the battery is not run flat.
The breaker for the area's lightsTests lamps and batteries properly, but cuts everything else on that circuit too.

For the long test the guide warns against adding a switch at each light to cut its power, which the electrical code does not allow, and suggests asking the maker how to hold the test.

Before you start

Who
Your own staff can make every test here. An electrician replaces failed batteries, lamps and units.
After the long test
The batteries take time to recharge. Test one area at a time, so an outage that day never finds a whole floor’s lights run down.
The record
Keep the log for the fire department: NFPA 101 asks for written records, and the NFC asks for them at the building.

When a check fails

A unit that does not light, or dims before the time is up, fails. Write a work order for the repair, test it again once fixed, and note both on the log.

An exit left dark is a gap in the way out: fix it before the next round, and ask your fire department what it expects meanwhile.

This list is a starting point to adapt with the units’ makers’ manuals and the code your jurisdiction adopts. It is information, not a substitute for an electrician where one is needed.

Add it to an inspection calendar

Put these checks, and the rest of the building's, on a year plan with the usual minimums for the United States or Canada, then print it or add it to your calendar: open the inspection calendar with emergency and exit lights ticked.

What the rules say

In the United States, NFPA 101, the Life Safety Code, sets the tests through the codes your state or city adopts, in the edition it adopts. In Canada, the National Fire Code sets them itself, in 6.5.1.6 to 6.5.1.8.

What the rules sayThe sections, the records to keep, and what was read.
  • United States. NFPA 101 (2012), 7.9.3.1.1 for the monthly 30-second and yearly 90-minute tests, 7.9.3.1.2 for self-testing units, and 7.10.9.2 for exit signs on a battery, as the Minnesota Department of Health’s guide reads them. Computer-based systems that run every test themselves (7.9.3.1.3) are left out here.
  • The US record. NFPA 101 asks for written records of the tests for the authority having jurisdiction. Minnesota’s fire code, the guide notes, asks for them to be kept three years, with the location, pass or fail, the date and who tested.
  • Canada. NFC 2020, 6.5.1.6 (battery units), 6.5.1.7 (other emergency lights, yearly) and 6.5.1.8 (exit signs), read in the code itself. The NFC (Division C, 2.2.1.2) asks for records kept at the building: at least the current and the previous ones, none destroyed within two years.
  • Your province. Each province and territory adopts its own edition of the NFC, and some, Ontario for one, publish their own fire code.

None of this is legal advice, and no log makes a building compliant.

Emergency light rounds in Maintensor: one round per floor

Build one procedure per floor, with a Heading for each light and sign. There is no ready-made library, so you type the list in once.

  • Each unit. An Inspection check for “comes on and stays lit”, answered Pass, Flag or Fail. For the yearly test, a Number step for the minutes it stayed lit, with the time in its name: “Minutes lit (90 or more)”.
  • The schedule. A work order that repeats monthly for the short test: on a date or on a weekday, the tests land 4 to 5 weeks apart, inside NFPA 101’s 3 to 5 weeks. A second one repeats yearly for the long test.
  • A Fail asks for a note and a photo before the next step, then offers a follow-up work order for the repair.
Five steps in the procedure builder, each with its type and a Required box: a checkbox, a number, an inspection check, a text answer and another number.
Five steps in the procedure builder, each with its type and a Required box: a checkbox, a number, an inspection check, a text answer and another number. An emergency light round is built from the same kinds of step.

What it does not do: Maintensor does not talk to self-testing units, so it holds only what the tester records, and a Number step flags nothing by itself. Only Admins and Full users answer checklists, so whoever makes the round needs a user seat. It records what was tested; it certifies nothing. The facility maintenance software page shows the rest of a building’s setup.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

How often do emergency lights need to be tested?

In the United States, NFPA 101 asks for a 30-second test of each battery light and exit sign every month, 3 to 5 weeks apart, and a 90-minute test once a year. In Canada, the National Fire Code asks for a monthly test that the lights come on when the power fails and a yearly test for the length they were designed for. These are the usual minimums.

What is the difference between the monthly and the yearly test?

The monthly test proves the unit switches to its battery and the lamps light, which takes 30 seconds. The yearly test proves the battery still holds enough charge to light the way out for the full design time, 90 minutes under NFPA 101. A unit can pass the first and fail the second, because an old battery lights the lamps but runs down early.

Do self-testing emergency lights still need to be checked?

Yes. Under NFPA 101, a self-testing unit runs its own 30-second test every 30 days and shows a fault on a status light, but someone still looks at that light every month, and the 90-minute test is still made once a year. The National Fire Code of Canada has no exception for self-testing units, so the usual monthly and yearly tests apply.

How long should emergency lighting test records be kept?

NFPA 101 asks for written records of the tests, kept for the authority having jurisdiction; some state fire codes set how long, such as three years in Minnesota. The National Fire Code of Canada asks for records kept at the building: at least the current and the previous ones, and none destroyed within two years of being made.